Project Description x
Transportation and installation of OSM modules.
Client: BCT
Site: Intel
Duration: 24 months
Staff: 25 employees
Transporting units from the manufacturing plant (dimensions: 6.6 meters in length, 2.3 meters in width, 3 meters in height, and weighing 4 tons).
Design and production of lifting beams: specifying and manufacturing custom lifting beams for lifting the units.
Mechanical connection: connecting the units to form a BAY (approximately 42 meters long).
Lifting and assembling the entire BAY (12 modules) and attaching it to the ceiling.
Coordination: The work is performed during the Base Build stage and requires coordination with multiple parties.