Client: BCT
Site: Intel
Duration: 24 months
Staff: 25 employees
Transporting units from the manufacturing plant (dimensions: 6.6 meters in length, 2.3 meters in width, 3 meters in height, and weighing 4 tons).
Design and production of lifting beams: specifying and manufacturing custom lifting beams for lifting the units.
Mechanical connection: connecting the BAY modules (12 modules, approximately 42 meters total long).
Lifting and assembling the entire BAY modules units and attaching them to the ceiling.
Coordination: The work is performed during the Base Build stage and requires coordination with multiple parties.