OSM Module transportation and installation

Project Description x

Transportation, rigging and installation of OSM modules.

Detailsx

Client: BCT
Site: Intel
Duration: 24 months
Staff: 25 employees

Project Scopex

Transporting units from the manufacturing plant (dimensions: 6.6 meters in length, 2.3 meters in width, 3 meters in height, and weighing 4 tons).

Design and production of lifting beams: specifying and manufacturing custom lifting beams for lifting the units.

Mechanical connection: connecting the BAY modules (12 modules, approximately 42 meters total long).

Lifting and assembling the entire BAY modules units and attaching them to the ceiling.

Coordination: The work is performed during the Base Build stage and requires coordination with multiple parties.